Construction

Construction

 Interior Modular Corridor

An interior shot of a long, prefabricated building made of sandwich panels. You can see a series of small, PVC-framed windows and a floor lined with durable dark-brown plywood. It looks like the “clean-up” phase of an accommodation or office block.

Main Steel Structure

A wide exterior shot of a large steel-frame warehouse under construction. Workers are busy on the ground, and a small white transport truck is parked under the shade of the partially completed roof. There’s a large red water tank in the foreground, standard for site dust control or supply.

Surveying Equipment

A close-up of two professional Trimble surveying instruments (a total station and a level) mounted on yellow tripods. This highlights the precision phase of the project, ensuring the foundations and steel columns are perfectly aligned.

Completed Site Office

The “after” shot! This is a fully functional open-plan office inside one of the modular units. It’s outfitted with cubicles, Dell monitors, wall-mounted fans, and even some office plants—a stark (and much cooler) contrast to the dusty construction outside.

Frame & Panel Assembly

A shot of the structural assembly phase. You can see the steel base frame of a modular unit sitting on concrete footings. A few wall panels have been installed, and a worker in a safety harness is standing by, showing the “bones” of the buildings seen in the other photos.

Heavy Lifting (Crane Operations)

A green KATO mobile crane is seen in action, likely positioning precast concrete barriers or components onto a flatbed trailer. Workers in safety gear are supervising the lift, with finished modular buildings visible in the background.

Technical Summary of the Facility

  • Structure & Facade: Reinforced masonry with a dual-tone (cream and grey) plaster finish.

  • Interior: Terrazzo flooring with ceramic tile wainscoting (dado) for durability and easy cleaning.

  • Windows: Aluminum frames with tinted glass, protected by external steel security grilles.

  • Classrooms: Equipped with integrated wooden desks, LED lighting, and ceiling fans.

  • Water System: Two HDPE storage tanks mounted on a cross-braced structural steel platform (Gravity System).

  • Security: Perimeter masonry wall with a double-leaf sheet metal gate.